High Voltage Electrical

On average, grid infrastructure in the United States is over 40 years old. With an estimated 55,000 electrical substations nationwide and more than 265,000 miles of transmission and distribution lines in California alone, updating infrastructure to meet current and future needs is a top priority.

It's estimated that there are 55,000 electrical substations in the United States and over 265,000 miles of transmission and distribution lines in California alone.

Population growth over the past 40 years is just one factor contributing to the strain on the aging energy grid. Increasing consumption demands driven by emerging technologies such as artificial intelligence, along with the integration of renewable energy sources—including wind, solar, and hydro—have all required smarter, more efficient approaches to electrical transmission.

CBI Power, Inc., provides expert services in the utility market. We look forward to partnering with you on your next grid infrastructure project.

Services Includes:

• EPC Substation and Switching Stations
• Transmission and Distribution
• System Undergrounding
• Demolition
• Mass Grading
• Concrete/Foundations
• Finish Grading
• Drilled Piers
• Boring- Horizontal Directional Drilling, Augering
• Underground Ductbank (Electrical and Telecommunications)
• Asphalt Paving

View some of our recent projects

230-500kV Darkstar Substation | Clark Bros Inc

230-500kV Darkstar Substation

The 500kV Darkstar Substation is part of the overall Edwards Sanborn Solar and Energy Storage, Phases 2, 3, & 4 project in Mojave, CA. Phase 2, 3, & 4 consisted of a 650MW Photovoltaic electric power plant & BESS facility along with 3-230kV & 1-500kV substations, and 11 miles of 230kV Transmission Line spread over 2,55...click learn more to see the complete project.


Learn More

Clark Bros Inc | Daylight Transmission Line

230kV Daylight Transmission Line

The 230kV Daylight underground Duct Bank and Transmission line were part of the overall Edwards Sanborn Solar and Energy Storage project in Mojave, CA. CBI Power, Inc. scope of services included clear and grub of the site area, approximately 960 linear feet of 230kV Circuit Duct Bank and construction four (4) Duct Ban...click learn more to see the complete project.


Learn More

Clark Bros Inc | Nova Power Bank

NOVA Power Bank

Previously a brownfield site, the NOVA Power Bank project in Menifee, California creates 680 megawatts of energy storage with the ability to power as many as 680,000 homes for 4 hours. The Engineering, Procurement and Construction (EPC) project built both battery storage and (3) 34.5-500kV substations which will ultima...click learn more to see the complete project.