Heavy Civil Projects

We specialize in delivering complex heavy civil infrastructure that shapes communities and drives progress. From large-scale earthworks to bridges and transportation networks, our team transforms challenging ideas into resilient, award-winning structures built to last.



CBI Advances Luna Solar Site Project with Safety, Teamwork, and Precision

Powering the Future: Luna Solar Site Construction Underway in Mendota, California

CBI crews are making major progress at the Luna Solar Site in Mendota, California — transforming raw land into a clean energy facility...click learn more to see the complete project.


Learn More

Clark Bros Inc | Fifth Standard Solar & Energy Storage Project

FIFTH STANDARD SOLAR & ENERGY STORAGE PROJECT

The Fifth Standard Solar Facility is a 150-megawatt (MW) solar photovoltaic (PV) facility with an onsite 20Mw solar PV generation facility and a 20Mw energy storage system. Power would tie into an existing transmission substation owned by PG&E (Gates Substation) is located approximately 0.4 mile southwest of the Projec...click learn more to see the complete project.


Learn More

Clark Bros Inc | Bellefield 1 Solar and Energy Storage Farm

BELLEFIELD 1 SOLAR AND ENERGY STORAGE FARM

The Bellefield Solar and Energy Storage Farm projected located Kern County, CA aimed at establishing a photovoltaic solar facility and energy storage system the with potential to generate up to 500 megawatts (MW) of alternating current (AC) utility-scale solar power, complemented by an energy storage capacity of up to...click learn more to see the complete project.


Learn More

Clark Bros Inc | Westside Main Canal Bridge

WESTSIDE MAIN CANAL BRIDGE

Built to provide permanent vehicle access to the Westside Battery Storage Facility, the project required construction of private access roads on both the north and south side of the proposed bridge to connect the facility to county owned Liebert Rd. The project entailed construction of a 23.5-ft wide...click learn more to see the complete project.


Learn More

Crossing Trails | How Clark Bros Inc Provided Habitat Restoration via Seeding, Fence Restoration and Junction

Crossing Trails

Crossing Trails Wind Farm, a 104 MW wind farm project in Seibert, Colorado with 24 turbines produces enough energy for 38,000 homes and is projected to save 184 million gallons of water while displacing carbon emissions. The site consists primarily of wheat fields and pastures, providing landowners with sustainable and...click learn more to see the complete project.


Learn More

Rexford Solar | Phase 1 | Clark Bros Inc Heavy Civil Projects

Rexford Solar – Phase 1

The Rexford 1 project involves the development and operation of a ground mounted solar photovoltaic (PV) facility with a capacity of up to 400 megawatts (MW). Additionally, the project includes the implementation of an energy storage system (ESS) with a storage capacity of up to 180 MW, an on-site substation, transmiss...click learn more to see the complete project.


Learn More